Request for Proposals: Nell Creek Fish Passage

Nell Creek Fish Passage Bid Packet

Project Summary

An existing road crossing over Nell Creek on the privately owned section of the South Bank Chetco River Road will be reconstructed to replace a failing, undersized 60 inch diameter corrugated metal culvert with an embedded, multi-plate arch pipe measuring 15 feet 4 inches in width by 10 feet 4 inches in height by 45 feet in length. Approximately 115 linear feet of roughened rock channel will be constructed, starting approximately 62 feet downstream of the road crossing, and extending through the upstream end of the pipe arch. Approximately 140 linear feet of asphalt (~190 SY) will be replaced where the road crossing is excavated. Approximately 130 feet downstream of the road crossing, an existing concrete sill will be removed and replaced with ~60 feet of roughened rock channel.

Construction Bid Process

In order to submit a construction bid, Contractor must attend an on-site pre-award meeting on Monday, July 22, 2024 at 2:30 p.m. The meeting location is: 99898 S Bank Chetco Road; Brookings, OR 97415. See attached Map 1 in full document linked below. Contact Matt Swanson (541) 373-0800 if you have questions.

Contractor must submit a Nell Creek Fish Passage Construction Bid Form (see page 5 of full document linked below) by 5:00 p.m. on Monday, July 29, 2024 to be considered for this project. Contractor may submit the form:

  • In-person at the Curry Soil and Water Conservation District office: 29286 Ellensburg Ave, Gold Beach, OR 97444.
  • By email: matt.swanson@currywatersheds.org
  • By fax: (541) 247-0408, or
  • By mail: Curry SWCD, Attn. Matt Swanson; PO Box 666, Gold Beach, OR 97444.

The Curry Watersheds Nonprofit will award the contract by the close of business on Monday, August 5, 2024, unless clarifying questions delay the award.

Files to Download

Nell Creek Fish Passage Bid Packet